“Looks like a great day to launch Endeavour for the final time,” Shuttle Launch Director Mike Leinbach radioed the crew, after the shuttle had been given the go for launch,” according to NASA.Įndeavour’s liftoff comes after nearly three weeks of delays, caused by a heater failure on one of the ship’s power units. less than a minute ago via web Favorite Retweet Reply NASA The Final Inspection Team reports no issues. Engineers determined that it would not affect launch, NASA said.Īll 6 astronauts are aboard Endeavour and the Close Out Crew is preparing to close the hatch. A small area of damaged ceramic tile near Endeavour’s side hatch was repaired this morning. Four spacewalks are planned during the mission.Įndeavour is scheduled to return to Earth on June 1.īy early Monday morning, the shuttle was fully fueled, the astronauts were strapped in for launch and NASA was reporting no technical issues. It will also deliver spare parts, including two communication antennas and a high-pressure gas tank. AMS is a massive supercooled magnet designed to soak up cosmic rays, and to search for dark matter and antimatter. You can watch the live stream of the mission here:ĭuring its 16-day mission, the crew will deliver to the International Space Station a $2 billion particle physics detector, know as the Alpha Magnetic Spectrometer, or AMS. The orbiter and its six-member crew – led by Commander Mark Kelly – are bound for the International Space Station, where they’re scheduled to dock at about 6 a.m. Main Engine Cutoff confirmed – space shuttle Endeavour is in space to begin a 16-day mission.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |